Borehamwood, Hertfordshire · Est. 2014
One Company.
Every Trade.
Your Project Done Right.
TCM Building & Maintenance Ltd was incorporated on 19 May 2014 with a straightforward aim: give homeowners and businesses in Borehamwood and Hertfordshire a single, accountable contractor who handles every stage of a build — from planning application to final coat of paint.

Constantin Popescu
Director & Founder · TCM Building & Maintenance Ltd
From the Director
Why We Built TCM the Way We Did
"I'm the director of TCM Building & Maintenance Ltd, a trusted, all-in-one building company based in Borehamwood, serving Hertfordshire, North London, and surrounding areas."
We specialise in both domestic and commercial construction, offering a full range of services from initial design to final handover. Whether it's a home renovation or a commercial fit-out, we manage every detail with quality, reliability, and transparency.
What sets us apart is our dedicated team: structural engineers, architects, interior designers, and skilled tradespeople, all working together to deliver projects on time and on budget. You don't deal with a different company for each trade. You deal with us — one contract, one point of contact, one standard of work.
Ten years in, that model still works. Our Checkatrade reviews are published unedited. Our clients come back for their next project. That's the measure we care about.
What TCM Is, Precisely
A Full-Service Building Contractor — Not a Broker
The building industry has a fragmentation problem. Most contractors manage one trade and subcontract everything else, which means the homeowner ends up coordinating between a bricklayer, a roofer, a plumber, an electrician, and a decorator — none of whom are accountable to each other. When something goes wrong, the blame gets passed around.
TCM was built to solve that. We are a directly employed, multi-trade contractor. Our structural engineers, architects, project managers, and tradespeople are part of the same organisation. They work to the same programme, the same quality standard, and the same client.
That structure matters for your project. It means design decisions are made with the build in mind. It means the programme is realistic because the people writing it are the people doing the work. And it means when you call us, you speak to someone who knows your project — not a call centre.
2014
Year Founded
500+
Projects Completed
21
Areas Covered
4.9★
Checkatrade Rating
Company History
Ten Years of Building in Hertfordshire
2014
Incorporated
TCM Building & Maintenance Ltd registered on 19 May 2014 in Borehamwood, Hertfordshire. The founding vision: a single contractor who handles every stage of a build, from structural groundwork to final decoration.
2016
Commercial Division
Expanded into commercial fit-outs and office refurbishments across Hertfordshire and North London, adding dedicated project managers for multi-trade contracts.
2018
Checkatrade Verified
Joined Checkatrade after passing background checks, insurance verification, and trade qualification reviews. Every review since has been published unedited.
2020
500+ Projects
Passed the milestone of 500 completed projects across domestic extensions, loft conversions, basement conversions, and commercial refurbishments.
2022
In-House Design Team
Brought structural engineers, architects, and interior designers in-house so clients receive a single point of contact from planning application to handover.
2024
10-Year Anniversary
A decade of building across Borehamwood, Watford, St Albans, Barnet, and 17 surrounding towns. The same commitment to quality, reliability, and transparency that started in 2014.
The Team
Every Discipline Under One Roof
Most building companies manage one trade and subcontract the rest. We don't. Our team covers every discipline a building project requires, which is why we can offer a single contract from design to handover.
Structural Engineers
Load calculations, RSJ beam specifications, and structural drawings prepared in-house — no waiting for external consultants.
Architects
Planning applications, permitted development assessments, and full architectural drawings handled by our own team.
Interior Designers
Space planning, material selection, and finish specifications so the inside of your project matches the quality of the structure.
Skilled Tradespeople
Bricklayers, carpenters, electricians, plumbers, plasterers, and decorators — all vetted, insured, and regularly working together.
Project Managers
Every project has a dedicated manager who coordinates trades, manages the programme, and reports to you weekly.
CDM Coordinators
We fulfil the Principal Contractor role under CDM 2015 on all notifiable projects, managing health and safety documentation from start to finish.
Credentials & Compliance
Verified, Insured, and Accountable
Before you invite any contractor onto your property, you should check three things: that they are who they say they are, that they carry the right insurance, and that their previous clients are willing to say so publicly. Here is our record on all three.
Checkatrade
Verified since 2018. Background checked, insured, and reviewed.
Companies House
Registered company number: TCM Building & Maintenance Ltd, incorporated 19 May 2014.
Public Liability Insurance
Full public liability and employers' liability insurance on every project.
CDM 2015 Compliant
Principal Contractor on all notifiable projects. Health and safety documentation provided as standard.
Waste Carrier Licence
Licensed waste carrier — all site waste removed and disposed of legally.
Where We Work
Based in Borehamwood.
Working Across 21 Areas.
Our base in Borehamwood puts us within 10 miles of Watford, St Albans, Barnet, Edgware, Potters Bar, Radlett, Bushey, Stanmore, Hatfield, Harrow, Wembley, Elstree, Shenley, Welwyn Garden City, Finchley, Hendon, and Mill Hill — as well as the wider Hertfordshire county.
Working within a defined radius means our teams travel short distances between sites, which keeps our programme reliable. When a job runs long, we don't lose a day to travel. When you need us on site at short notice, we can be there.
View all areas we cover →Ready to Talk About Your Project?
We offer a free, no-obligation consultation for all new projects. Tell us what you're planning and we'll give you an honest view on feasibility, planning requirements, and likely cost — before you commit to anything.
Or read our Checkatrade reviews first.
