Skip to main content
TCM Building & Maintenance
Roofing Specialists24/7 Emergency

Roofing Services
London & Hertfordshire

Pitched roofs, flat roofs, guttering, chimneys, and loft conversion roofing. Expert roofing contractors with over 15 years of experience across London and Hertfordshire.

Free Roof Survey
10-Year Guarantee
CSCS Certified
Emergency Response

Roofing Services We Provide

From a single missing tile to a complete roof replacement, our in-house roofing team handles every type of roofing work across London and Hertfordshire.

Most Popular

Pitched Roof Repairs & Replacement

Tile and slate replacement, ridge and hip repairs, felt underlays, and full re-roofing of pitched roofs on houses and extensions.

Flat Roof Systems

EPDM rubber, GRP fibreglass, felt, and liquid-applied flat roof systems. New installations and replacement of failed flat roofs.

Lead Flashing & Pointing

Lead flashing around chimneys, dormers, and abutments. Repointing of chimney stacks and parapet walls to prevent water ingress.

Guttering & Fascias

UPVC and cast-iron guttering replacement, fascia and soffit boards, and full rainwater management systems.

Popular

Loft Conversion Roofing

Dormer construction, Velux window installation, hip-to-gable alterations, and mansard roof structures for loft conversions.

Extension Roofing

Pitched and flat roofs for single and double-storey extensions, including lantern roofs, skylights, and bi-fold door canopies.

Emergency

Emergency Roof Repairs

24/7 emergency response for storm damage, fallen trees, and urgent leaks. Temporary weatherproofing and permanent repairs.

Chimney Works

Chimney stack repointing, rebuilding, capping, and removal. Lead flashing replacement and chimney pot installation.

Our Roofing Process

From free survey to completion — a clear, professional process with no surprises.

01

Free Roof Survey

We carry out a thorough inspection of your roof — from ground level, ladder, or scaffold — and provide a detailed written report with photographs.

02

Detailed Quotation

A fixed-price quotation is provided within 24–48 hours. No hidden extras. We specify materials, guarantee periods, and programme.

03

Scaffold & Access

Where required, we erect scaffold to BS EN 12811 standard. All our roofers hold CSCS cards and work to full health and safety requirements.

04

Roofing Works

All works are carried out by our experienced in-house roofing team. We use quality materials from trusted UK suppliers.

05

Inspection & Sign-Off

On completion, we carry out a thorough inspection with you and provide all relevant guarantees, warranties, and completion documentation.

Roofing Work on Hertfordshire Properties

These are photographs from actual TCM Building roofing projects in Hertfordshire — showing the condition we find roofs in, and the quality of work we deliver.

Broken and slipped verge tiles on a pitched roof in Hertfordshire before repair
Before: Broken verge tiles — slipped and cracked tiles at the gable verge allowing water ingress. A common issue on 1960s–80s Hertfordshire properties.
Gutter leaf guard installation at eaves level during roofing maintenance in Hertfordshire
Gutter leaf guard installation — fitted at eaves level during a roofing maintenance visit. Prevents autumn blockages and reduces the risk of overflow and fascia rot.
New treated timber battens and clay plain tiles laid during full roof retile in Hertfordshire
After: New battens and clay tiles — treated timber battens and machine-made clay plain tiles laid in staggered bond. 15-year workmanship guarantee.

Roofing Cost Guide — London 2025

Indicative prices for London and Hertfordshire. We provide fixed-price quotations after a free survey.

Roofing WorkTypical CostNotes
Tile / Slate Repair (up to 10 tiles)£150 – £400No scaffold required
Partial Re-Roof (half a roof)£2,500 – £5,000Includes scaffold
Full Re-Roof (3-bed semi)£5,000 – £10,000Includes scaffold & felt
Flat Roof Replacement (garage)£800 – £2,000EPDM or GRP
Flat Roof Replacement (extension)£1,500 – £4,000EPDM or GRP
Chimney Repointing£400 – £900Includes scaffold
Lead Flashing Replacement£300 – £800Per chimney or abutment
Guttering Replacement (full house)£600 – £1,500UPVC

Prices include VAT. London premium applies. Survey required for accurate quotation.

10-Year Guarantee
On all new installations
CSCS Certified
All operatives
24/7 Emergency
Storm & leak response
5.0 Checkatrade
Verified reviews
"TCM replaced our entire roof after storm damage. They were professional from start to finish — the survey was thorough, the price was fair, and the work was completed in three days. The roof looks immaculate."
Patricia H.
Borehamwood, Hertfordshire — Full Roof Replacement

Roofing FAQs

Book Your Free Roof Survey

Our roofing specialists will inspect your roof, identify any issues, and provide a detailed written report and fixed-price quotation — completely free of charge.

It's easy to overlook your roof until a problem arises, isn't it? A small leak can quickly become a major headache, threatening your home's structure and your belongings. You might be wondering if that damp patch is serious, or if those missing tiles mean a bigger issue is brewing. Roofing, at its core, is about protecting your home from the elements. It's the essential shield against rain, wind, and everything else the British weather throws at us. From the foundational structure to the final layer of tiles or membrane, a well-maintained roof ensures your property stays dry, warm, and secure. Why does this matter to you? Because a healthy roof isn't just about aesthetics; it's about safeguarding your investment, preventing costly internal damage, and maintaining your home's energy efficiency. Ignoring minor issues can lead to significant structural problems and expensive repairs down the line. Don't let a small concern turn into a major crisis.

You've noticed a damp patch on your ceiling, or perhaps a few slates have come loose after a storm. Maybe your energy bills seem higher than usual, and you're wondering if your roof is to blame. You know something isn't quite right, but what's the best way to address it? Is it a simple fix, or something more serious?

What You Need to Know

Durable Flat Roofing

Considering a flat roof for an extension or garage? We specialise in high-quality flat roofing systems, including modern EPDM rubber roofing and traditional felt. These materials offer excellent waterproofing and longevity, giving you peace of mind for years to come.

Reliable Pitched Roof Repairs

Damaged or missing tiles can compromise your entire roof's integrity. Our team expertly handles all types of pitched roof repairs, from replacing a few broken tiles to fixing storm damage. We ensure your roof is watertight and looks its best.

Comprehensive Re-Roofing Services

Is your roof beyond repair, or are you planning a major renovation? We provide complete re-roofing solutions, carefully removing your old roof and installing a brand new, robust system. This is a long-term investment in your home's protection.

Expert Lead Work & Guttering

Lead work is crucial for weatherproofing vulnerable areas like chimneys and valleys. We also install and repair guttering systems, ensuring rainwater is efficiently directed away from your property. Proper guttering prevents damp and foundation issues.

Not sure which flat roof system is right for your extension or garage? Our in-depth guide compares GRP fibreglass, EPDM rubber, felt, and liquid-applied flat roof systems — covering lifespan, cost, and which performs best in the Hertfordshire climate.

Everything Else You Should Know

Understanding Roofing Costs

The cost of roofing work varies significantly based on the type of roof, materials chosen, and the extent of the damage or installation. A small repair might be a few hundred pounds, while a full re-roofing project could range from several thousand to tens of thousands. We provide clear, itemised quotes so you know exactly what to expect, with no hidden surprises.

Planning & Building Regulations

For significant roofing projects, especially re-roofing or structural changes, building regulations often apply. This ensures your new roof meets safety and energy efficiency standards. We can guide you through the necessary approvals and ensure all work complies with local Hertfordshire regulations, making the process smooth and stress-free.

Common Roofing Mistakes to Avoid

One of the biggest mistakes homeowners make is delaying repairs. A small leak can quickly cause extensive damage to timbers, insulation, and ceilings. Another common error is attempting DIY repairs without proper knowledge or safety equipment, which can lead to further damage or injury. Always choose experienced, insured professionals for roofing work.