Skip to main content
TCM Building & Maintenance
Beautiful loft conversion bedroom with Velux skylights in London

Loft Conversions
London & Hertfordshire

Transform your unused loft space into a beautiful, functional room. TCM Building specialises in all types of loft conversion — from simple Velux installations to complex L-shaped dormers — across London and Hertfordshire.

5★ Checkatrade Rating
Building Regs Approved
150+ Lofts Completed
Free Loft Survey

Turn Wasted Roof Space
Into Living Space

A loft conversion is the process of converting an existing, unused loft or attic space into a habitable room — typically a bedroom, home office, bathroom, or playroom. It is one of the most cost-effective ways to add living space to your home because the roof structure already exists; you are simply making use of space that is currently going to waste.

For homeowners in London and Hertfordshire, where property prices are high and gardens are often small, a loft conversion is frequently the most sensible alternative to moving. It avoids the significant costs of stamp duty, estate agent fees, and conveyancing, while creating a home that is perfectly tailored to your needs.

TCM Building has completed over 150 loft conversions across London and Hertfordshire. Our team manages the entire process — from the initial loft survey and architectural drawings through to Building Regulations approval, structural engineering, and final decoration.

Loft Conversions Completed150+
Average Added Value20–25%
Typical Build Time8–14 wks
Checkatrade Rating5.0 ★
Book a Free Loft Survey

Which Type Is Right for Your Home?

Suitable for most house types — terraced, semi-detached, and detached

Dormer Loft Conversion

A dormer loft conversion is the most popular type in London and Hertfordshire. It involves extending the existing roof vertically to create a box-shaped structure with a flat or pitched roof, adding significant headroom and floor area. A rear dormer can often be built under Permitted Development rights, making it the most straightforward option for most homeowners.

Maximum headroom and usable floor area
Can accommodate en-suite bathroom
Often built under Permitted Development
Full-height windows for natural light
Can be combined with Velux windows
Typical Cost
£35,000 – £60,000
Added Value
20–25% property value increase
Build Time
8–12 weeks
Get a Quote
Dormer Loft Conversion

Key Suitability Checks

Most lofts in London and Hertfordshire are suitable for conversion. Here are the key factors we assess during the free loft survey.

Minimum head height of 2.2m at the ridge (measured from floor joist to underside of ridge)
Roof pitch of at least 30 degrees (for most conversion types)
Sufficient floor area — at least 5.5m × 7.5m is recommended for a usable room
Adequate structural support in the existing floor joists
No major obstructions such as water tanks or chimney stacks in the loft space

Not sure if your loft qualifies?

Book a free loft survey and we'll assess your loft in person. Even if your loft doesn't meet all the criteria above, there may still be options — for example, a Velux conversion requires less headroom than a dormer.

From Survey to Handover

01

Free Loft Survey

We visit your property and carry out a full loft survey — measuring headroom, assessing the roof structure, and identifying any potential issues.

02

Design & Drawings

Our design team produces full architectural drawings showing the proposed layout, staircase position, and window locations.

03

Planning & Building Regs

We advise on Permitted Development vs. planning permission and submit all necessary applications. We also handle Building Regulations approval.

04

Structural Engineering

A structural engineer designs the steel beams, floor joists, and any necessary strengthening works.

05

Construction

Our team carries out all works — from temporary roof protection and structural steelwork through to plastering, electrics, and plumbing.

06

Finishing & Handover

We complete all second-fix works, install the staircase, and finish to your chosen specification before final handover.

Loft Conversion Work in Progress

These photographs were taken on TCM Building loft conversion sites in Hertfordshire. They show the insulation and structural work that makes the difference between a conversion that meets minimum standards and one built to last.

PIR insulation installed around Velux roof window during loft conversion in Borehamwood Hertfordshire
100mm PIR insulation boards installed between and over the rafters around a Velux roof window. This warm roof method meets current Part L Building Regulations and eliminates cold bridging at the rafter edges.
Roof window with insulated pitched ceiling lining inside a completed loft conversion in Hertfordshire
Insulated pitched ceiling lining around a roof window inside a completed loft conversion. The continuous insulation layer and airtight membrane prevent heat loss and condensation at the eaves junction.

Loft Conversion Cost Guide

All prices are indicative for London and Hertfordshire. A fixed-price quotation is provided after the free loft survey.

Conversion TypeTypical CostAdded ValueBuild TimePlanning
Velux / Rooflight£20,000 – £40,00015–20%4–8 weeksUsually PD
Rear Dormer£35,000 – £60,00020–25%8–12 weeksOften PD
Hip-to-Gable£42,000 – £70,00020–25%10–14 weeksRequired
Mansard£45,000 – £75,00025–30%10–14 weeksRequired
L-Shaped Dormer£50,000 – £90,00025–35%12–16 weeksRequired

PD = Permitted Development. All prices exclude VAT. Fixed-price quotation provided after free loft survey.

"We had a full L-shaped loft conversion done and couldn't be happier. From planning to completion, TCM managed everything seamlessly. The quality of workmanship is exceptional — we now have two beautiful bedrooms and a bathroom where there was nothing before."
JT
James T.
L-Shaped Loft Conversion · Borehamwood

Book Your Free Loft Survey

Our loft specialist will visit your property, assess suitability, and advise on the best conversion type for your home — completely free of charge.

Full loft measurement and headroom assessment
Advice on conversion type and planning requirements
Indicative cost guide for your specific loft
No obligation, no pressure

Running out of space at home is a common headache, isn't it? Maybe your family's growing, or you just need that extra room for a home office, a guest bedroom, or even a quiet retreat. You're probably wondering how to make your home work better for you without the upheaval of an extension or moving house entirely. A loft conversion is simply transforming your unused attic into a functional, habitable room. We're talking about converting that dusty storage area into a bright, airy space that truly enhances your home. It's about smart design and clever construction, turning dead space into living space. Why does it matter? It's a fantastic way to add significant value to your property, often more cost-effectively than a traditional extension. Plus, you get to stay in the home and area you love, avoiding all the stress and expense of moving. It's about creating the space you need, right where you are.

Do you ever look up at your unused attic space and wonder what it could become? Perhaps you're feeling the squeeze in your home, dreaming of an extra bedroom, a dedicated workspace, or just more room to breathe. You know you need more space, but you're not sure how to achieve it without turning your life upside down.

What You Need to Know

Tailored Design & Planning

Every home is unique, and so is every loft conversion. We work closely with you to design a space that fits your lifestyle and budget, ensuring it complements your existing home. From initial concepts to detailed drawings, we'll guide you through the whole process.

Expert Craftsmanship & Build Quality

Our skilled team brings years of experience to every project, ensuring your loft conversion is built to the highest standards. We use quality materials and proven techniques to create a durable, beautiful, and safe new space for your family.

Seamless Project Management

We handle everything from start to finish, coordinating all trades and ensuring the project runs smoothly and on schedule. You'll have a dedicated project manager keeping you informed every step of the way, making the process stress-free for you.

Compliance & Regulations Handled

Navigating planning permission, Building Regulations, and the Party Wall Act can feel overwhelming. Don't worry, we've got it covered. Our team manages all the necessary paperwork and liaises with local authorities and structural engineers to ensure full compliance.

Everything Else You Should Know

Understanding Loft Conversion Costs

The cost of a loft conversion varies quite a bit depending on the type, size, and finishes you choose. Things like dormer, hip-to-gable, or mansard conversions each have different structural requirements and, therefore, different price points. We provide clear, detailed quotes upfront so you know exactly what to expect, with no hidden surprises.

Planning & Regulations: What You Need to Know

Most loft conversions fall under permitted development, meaning you might not need full planning permission. However, Building Regulations approval is always a must to ensure safety and structural integrity. We'll help you understand the specific requirements for your property and handle all the applications.

Loft Conversion vs. Moving House

When you're weighing up your options, a loft conversion often comes out on top compared to moving. You save on stamp duty, solicitor fees, and the general upheaval of relocating. Plus, you get to add significant value to your current home while staying in the neighbourhood you love.

Common Mistakes to Avoid

One big mistake is not properly assessing your roof structure early on; not all lofts are suitable for conversion without major work. Another is underestimating the importance of good insulation and natural light. We'll help you avoid these pitfalls, ensuring your conversion is both practical and comfortable.

Loft Conversion FAQs

Ready to Transform Your Loft?

Book a free loft survey today. We'll assess your loft, advise on the best conversion type, and provide a detailed fixed-price quotation.