Commercial
Fit-Outs
Cat A and Cat B office fit-outs, retail, restaurant, and industrial fit-outs across London and Hertfordshire. Turnkey project management from design to handover.
Commercial Fit-Out Services
From a small office refurbishment to a large-scale Cat B fit-out, we deliver commercial projects on time and within budget.
Office Fit-Outs
Category A and Category B office fit-outs — from shell and core through to fully furnished, branded workspaces.
Retail Fit-Outs
Shop fronts, retail interiors, display fixtures, and customer-facing spaces designed to maximise footfall and sales.
Restaurant & Hospitality
Commercial kitchens, dining areas, bar installations, and hospitality interiors to exacting hygiene and building standards.
Healthcare & Education
Clinical spaces, consulting rooms, classrooms, and educational facilities built to specialist regulatory requirements.
Warehouse & Industrial
Mezzanine floors, partitioning, welfare facilities, and industrial fit-outs for logistics and manufacturing environments.
Office Refurbishments
Modernisation and reconfiguration of existing office spaces — new partitioning, suspended ceilings, M&E upgrades, and redecoration.
Our Commercial Fit-Out Process
A structured, transparent process that keeps your project on time and on budget.
Initial Consultation & Brief
We meet with you to understand your business requirements, brand identity, budget, and programme. We review existing drawings and carry out a measured survey.
Design & Planning
We produce detailed design drawings, specifications, and a fixed-price tender. We manage any planning applications or building control submissions required.
Pre-Construction
Procurement of long-lead items, subcontractor appointments, and a detailed construction programme. We appoint a dedicated project manager for your project.
Construction Phase
All works are carried out by our in-house team with specialist subcontractors for M&E, data, and AV. Weekly progress reports and site meetings.
Snagging & Handover
A thorough snagging process ensures every detail is correct. We provide all O&M manuals, warranties, and as-built drawings on handover.
Commercial Fit-Out Cost Guide
Indicative costs per square foot for London and Hertfordshire commercial fit-outs.
| Fit-Out Type | Typical Cost | Notes |
|---|---|---|
| Cat A Office Fit-Out | £35 – £65 per sq ft | Shell & core to basic finish |
| Cat B Office Fit-Out | £65 – £120 per sq ft | Fully fitted & furnished |
| High-Spec Office Fit-Out | £120 – £200+ per sq ft | Premium specification |
| Retail Fit-Out | £50 – £150 per sq ft | Dependent on specification |
| Restaurant Fit-Out | £80 – £200 per sq ft | Including commercial kitchen |
| Office Refurbishment | £25 – £80 per sq ft | Existing space reconfiguration |
"TCM delivered our 3,500 sq ft office fit-out in Borehamwood on time and within budget. The project management was excellent — weekly updates, no surprises, and a superb finish. Our team loves the new space."
Commercial Fit-Out FAQs
Ready to Transform Your Commercial Space?
Contact us for a free consultation and fixed-price quotation for your commercial fit-out project.
Transforming a commercial space can feel like a huge undertaking, can't it? You're probably thinking about how to make your office, shop, or restaurant not just look good, but also work better for your business and your people. It's about more than just aesthetics; it's about creating an environment that truly supports your goals and reflects your brand. So, what exactly are commercial fit-outs? Simply put, they're the process of making an interior space suitable for occupation. This includes everything from the initial structural work (CAT A) to the final touches like partitioning, flooring, and branding (CAT B). We handle office fit-outs, retail fit-outs, and restaurant/hospitality fit-outs, ensuring every detail aligns with your specific needs. Why does this matter so much? A well-executed fit-out can dramatically boost productivity, enhance your brand image, and ensure your space complies with all the latest regulations. It's an investment in your business's future, creating a welcoming and efficient environment for both your staff and your customers.
Do you feel like your current business premises just aren't working for you anymore? Maybe your team's productivity is dipping, or your space doesn't quite reflect your brand's professionalism. Perhaps you're expanding and need more functional areas, or your existing layout simply feels outdated and inefficient. It's a common challenge for businesses, and recognising these signs is the first step towards a better solution.
What You Need to Know
Tailored Solutions for Your Business
Every business is unique, and your commercial space should reflect that. We don't believe in one-size-fits-all solutions. Instead, we work closely with you to understand your specific operational needs, brand identity, and budget, crafting a bespoke fit-out plan that's perfectly aligned with your objectives.
Seamless Project Management
We know you've got a business to run. That's why our experienced project managers oversee every stage of your fit-out, from initial design to final handover. We ensure clear communication, stick to agreed timelines, and minimise disruption to your daily operations, making the process as smooth and stress-free as possible.
Quality Craftsmanship & Materials
Your commercial space deserves the best. We use only high-quality materials and employ skilled tradespeople who take pride in their work. This commitment to excellence ensures a durable, aesthetically pleasing, and functional environment that will serve your business well for years to come.
Compliance & Safety First
Navigating building regulations and safety standards can be complex. We take that burden off your shoulders. Our team is fully up-to-date with all relevant legislation, ensuring your commercial fit-out is not only beautiful and functional but also completely compliant and safe for everyone who uses it.
Everything Else You Should Know
Understanding Commercial Fit-Out Costs
Curious about the investment required for a commercial fit-out? Costs can vary significantly based on the scope, materials, and complexity of your project. We provide transparent, detailed quotes upfront, breaking down expenses so you know exactly what you're paying for. Let's discuss your vision and give you a clear picture.
Navigating Planning & Regulations
Worried about permits and local authority approvals? Commercial fit-outs often involve specific planning considerations and building regulations. Our team has extensive experience in Borehamwood and Hertfordshire, guiding you through the necessary paperwork and ensuring your project meets all legal requirements without a hitch.
Fit-Out vs. Refurbishment: What's Right for You?
You might be wondering whether a full fit-out or a refurbishment is what your space needs. A fit-out typically involves transforming an empty shell, while a refurbishment updates an existing space. We can help you assess your current situation and future goals to determine the most effective solution for your business.
Avoiding Common Fit-Out Pitfalls
Undertaking a commercial fit-out can be tricky, and there are common mistakes businesses make. These include underestimating budgets, poor planning, or choosing the wrong contractor. We'll share our expertise to help you steer clear of these issues, ensuring your project is a success from start to finish.
Where We Deliver Commercial Fit-Outs
TCM Building & Maintenance is based in Borehamwood and serves Hertfordshire, North London, and the surrounding area. Each location page covers planning authority details, property types, and local considerations specific to that area.
Our home base. Fast response times across the whole town.
Serving Radlett's conservation areas and Green Belt properties.
Covering Bushey, Bushey Heath, and the surrounding Hertsmere area.
Serving Potters Bar, Brookmans Park, Northaw, and Cuffley.
Full coverage across Watford and the Three Rivers district.
Experienced in St Albans conservation areas and listed buildings.
Covering Hatfield, Welham Green, Birchwood, and Old Hatfield.
Specialists in the WGC Conservation Area's Arts and Crafts properties.
Serving all parts of the London Borough of Barnet.
Covering Edgware, Canons Park, Burnt Oak, and Queensbury.
Serving Stanmore, Harrow Weald, Belmont, and the surrounding area.
Not sure if we cover your area? Call 07305 121634 — we serve a wide area across Hertfordshire and North London.
