Building Work You
Can Inspect
The examples below illustrate project types and scope questions. They are not presented as verified TCM case records, project locations, contract values or outcomes; those details require approved project evidence and publication permission.

House Extension Scope
Illustrative extension scope covering structure, building fabric, glazing, services interfaces and internal finishes. The actual design, responsibilities, programme and price depend on the property and brief.

House Extension Scope
Illustrative extension scope covering structure, building fabric, glazing, services interfaces and internal finishes. The actual design, responsibilities, programme and price depend on the property and brief.

Loft Conversion Scope
Illustrative loft-conversion scope. Roof form, structure, staircase, openings, fire-safety, services and approvals need to be resolved for the individual property.

Property Refurbishment Scope
Illustrative refurbishment scope combining building fabric, internal finishes and specialist interfaces where required. Existing condition and client specification determine the final scope.

Commercial Fit-Out Scope
Illustrative commercial fit-out scope. Starting condition, landlord/tenant responsibilities, M&E interfaces, phasing, specification and handover requirements should be defined before pricing.

Garage Conversion Scope
Illustrative garage-conversion scope. Existing construction, floor level, openings, insulation, services, parking implications and approvals all need project-specific assessment.

Basement Conversion Scope
Illustrative basement-conversion scope. Existing cellar adaptation and new excavation are materially different projects; structure, water management, access and specialist design need to be defined before pricing.

Roofing Scope
Illustrative roofing scope. The repair or replacement decision depends on the actual covering, substrate, junctions, drainage, insulation, condition and selected product system.

Bathroom Refurbishment Scope
Illustrative bathroom-refurbishment scope covering layout, waterproofing interfaces, finishes and regulated plumbing/electrical work where applicable.
What to Expect from TCM
These scope examples do not create universal TCM commercial terms. For a real project, confirm the site information required, quotation basis, programme responsibilities, specialist appointments, payment terms and point of contact in the written project documents.
How we quote, manage scope, and handle changes — explained transparently.
Review-platform profiles, ratings, counts and testimonial permissions remain under verification before they are reused as TCM proof.
Contact TCM by telephone or email. Contact TCM by telephone, email or the enquiry form.information and assessment requirements remain project-specific.
Case Details Require Verified Source Evidence
Project-specific photographs, addresses, contract values, programmes, outcomes and client narratives will only be published when the Experience Inputs Register contains approved source and permission evidence for that exact case. Until then, this page remains a project-type and scope gallery rather than a case-study archive.
Discuss Your
Project
Contact TCM by telephone, email or the enquiry form.Project coverage, assessment requirements and quotation scope remain project-specific.