Skip to main content
Borehamwood, Hertfordshire 07305 121634
TCM Building & Maintenance

Bathroom
Fitting

Bathroom fitting, wet-room and en-suite building work from TCM’s Borehamwood base. Layout, waterproofing, services, finishes and specialist responsibilities are confirmed for the individual project.

Bathroom Services

Full Bathroom Installation

Bathroom fit-out from strip-out through agreed finishes, with plumbing, electrical and other specialist interfaces coordinated according to the project scope.

Wet Rooms & Walk-In Showers

Wet rooms and walk-in shower spaces with waterproofing, drainage, flooring and enclosure details defined by the project specification.

En-Suite Bathrooms

En-suite design and installation for loft conversions, extensions, and bedroom refurbishments. Space-saving solutions for compact rooms.

Accessible Bathrooms

Bathroom layouts can include level-access showers, grab rails or other accessibility-focused features where requested. Suitability and any formal accessibility requirements are project-specific.

Bathroom Tiling

Floor and wall tiling to the agreed product, substrate preparation and layout specification.

Bathroom Refurbishment

Refresh your existing bathroom with new sanitaryware, tiling, and decoration without the cost of a full strip-out.

Project Design
Scope confirmed per room
Specialist Interfaces
Competent route where required
Customer Reviews
See published reviews
Coordinated Delivery
Direct + specialist work

Customer feedback

Project-specific testimonials are only reused where their source, attribution and publication permission are approved. This page does not present an unverified bathroom case or completion-time claim.

Read published reviews

Bathroom Installation FAQs

Design Your New Bathroom

Contact TCM to discuss your project. Any design input, assessment, specialist work and quotation scope are confirmed for the individual bathroom project.

A bathroom project can range from replacing sanitaryware and finishes to a full room reconfiguration with new plumbing, electrical, ventilation and waterproofing work. TCM can undertake the building work directly and coordinate specialist or regulated trades where required. Layout, wet-area specification, product choices, ventilation, services and finishing responsibilities are confirmed for the individual project.

Perhaps you're just starting to notice your bathroom isn't quite right – maybe the tiles are looking dated, the shower isn't as powerful as it used to be, or you simply need more storage. You know something needs to change, but you're not sure what the best solution is yet. We can help you explore the possibilities.

What You Need to Know

Layout & Specification

The room layout, sanitaryware, storage, access, wet areas, finishes and product selections should be resolved against the measured space and household brief before the quotation is treated as complete.

Waterproofing & Wet Areas

Wet-area construction and waterproofing should follow the selected system and project specification. The correct build-up depends on the room, substrate, products and intended use rather than one universal bathroom detail.

Specialist & Regulated Work

Plumbing, electrical and ventilation work can involve specialist or regulated trades. TCM can coordinate those interfaces where required, with the responsible parties and certification route confirmed for the project.

Finishes & Handover

Tiling, sanitaryware, joinery, decoration and other finishes should be stated in the specification. Applicable product information, certificates and warranty/aftercare terms depend on the products and providers actually used.

Everything Else You Should Know

Understanding Bathroom Project Costs

Bathroom cost depends on existing condition, layout changes, sanitaryware, waterproofing, services, ventilation, tiling, finishes, access, specialist input, VAT and exclusions. Compare quotations on the same scope rather than relying on a generic room price.

Planning & Building Regulations

Planning permission and Building Regulations are separate questions. Internal bathroom work may not require planning permission, while structural, ventilation, drainage, electrical or other regulated work can require specific technical/compliance routes. Confirm the responsibilities for the actual project.

Common Bathroom Renovation Risks

Incomplete product selections, unresolved waterproofing details, poor ventilation planning and late changes can affect cost and programme. Resolve the relevant information in the project specification before installation where practicable.