Skip to main content
Borehamwood, Hertfordshire 07305 121634
TCM Building & Maintenance
If there is an active fire or immediate danger to life, use the public emergency route first. TCM urgent-repair availability remains case-specific after the site is safe to assess and should be checked through the verified contact-route status.
Urgent EnquiriesAssessment Led

Fire & Flood
Renovation

Fire and flood renovation work, with scope assessment and specialist coordination where required. Availability depends on the issue, location and contractor availability.

Urgent repair enquiries
Scope assessment
Safety-first approach
Specialist support where required

What We Restore

TCM can undertake agreed reinstatement building work and coordinate specialist contractors or professional disciplines where that responsibility is included in the project scope.

Fire Damage Restoration

Building repair and reinstatement work following assessment and any relevant specialist input.

Flood & Water Damage

Assessment-led building repair and reinstatement after water ingress or flooding.

Project Coordination

TCM can undertake agreed building-work scope and coordinate specialist contractors or professional disciplines where that responsibility is included.

Our 6-Stage Restoration Process

A structured approach to assessing the building-work scope and identifying the specialist input required before work is arranged.

01

Urgent Route Check

Address immediate danger through the appropriate public emergency or competent-specialist route first. Building-work availability, coverage and contact channels remain project-specific and under verification.

02

Assessment

If a visit is arranged, assess the visible condition and identify whether specialist or professional input is required.

03

Make-Safe and Stabilisation

Any urgent building measures must follow the appropriate safety route. Immediate danger should be referred to the relevant emergency authority or competent specialist first.

04

Agree the Scope

Confirm the building-work scope, access, responsibilities, exclusions and any insurer or specialist requirements before work begins.

05

Building Work

TCM can deliver building work directly and coordinate specialist contractors or professional disciplines where appropriate.

06

Reinstatement Planning

Agree the required finishes, inspection points and any remaining specialist work as the project progresses.

Urgent Enquiries
Availability depends on the individual case
Safety First
Use the appropriate emergency route for immediate danger
Scope Assessment
Agree the required building work before it begins
Specialist Support
Required professional disciplines can be coordinated

Frequently Asked Questions

Need Emergency Help Right Now?

For immediate danger involving fire, gas, electricity or serious structural risk, use the appropriate public emergency or competent specialist route first. Once the property is safe to assess, urgent building-repair availability and reinstatement scope remain case-specific and should be checked through the contact page.

Or contact TCM.

Fire and flood damage can affect building fabric, finishes and services. Make immediate dangers safe through the appropriate emergency authority or competent specialist. TCM can undertake agreed building-work scope and coordinate specialist disciplines where that responsibility is included for the reinstatement project. The suitable route depends on the condition of the property, safe access, the assessment findings and any insurer or regulatory requirements. Agree the scope and responsibilities before work begins.

Record visible damage where it is safe to do so, avoid entering an unsafe area and contact the appropriate emergency authority or competent specialist where there is an immediate risk. A building-work scope can be discussed once the situation is safe to assess.

What You Need to Know

Fire Damage Building Work

Fire damage may require a condition assessment, removal of damaged finishes and reinstatement work. The scope depends on the property and the relevant specialist findings.

Flood and Water Damage

Water ingress can affect finishes and building elements. Assessment, drying and repair requirements should be confirmed before a programme of work is agreed.

Specialist Requirements

Smoke, soot, electrical, gas, structural or hazardous-material concerns may require appropriate competent or licensed specialist input.

Structural Reinstatement

Structural alterations must follow the appropriate professional and regulatory route. TCM can coordinate the building work and relevant specialist disciplines.

Everything Else You Should Know

Scope and Cost

Cost depends on the condition found, the agreed specification, access, materials, specialist input and any change to the scope. Request a written scope before work is arranged.

Insurance and Regulations

Contact your insurer about any claim and ask what information it requires. Insurance cover, Building Regulations and professional requirements depend on the individual case.

Professional Input

Fire and flood damage can involve regulated or high-risk work. The appropriate competent or licensed specialist should assess and carry out reserved work.

Before Work Starts

Record the condition where safe, protect people from immediate hazards and agree access, scope, responsibilities and any specialist requirements before work begins.