Skip to main content
Borehamwood, Hertfordshire 07305 121634
TCM Building & Maintenance
Commercial refurbishment by TCM Building & Maintenance
Commercial ServicesHertfordshire & North London

Commercial
Refurbishment

Commercial refurbishment from TCM’s Borehamwood base, including landlord, occupier and reinstatement scopes. Project coverage, phasing and specialist responsibilities are confirmed for the individual premises.

Project-Specific ScopeDetailed QuotationsSpecialist Requirements IdentifiedOccupied-Premises PlanningHandover by Agreed Scope

What We Deliver

Landlord Refurbishment

Landlord Scope

Void or occupied commercial refurbishment to an agreed landlord scope. Starting condition, retained elements, landlord requirements and re-letting specification are defined for the individual premises.

Tenant Improvement Works

Occupier Scope

Refurbishment of occupied or recently vacated commercial space to an agreed occupier brief, with landlord interfaces and specialist responsibilities confirmed for the project.

Dilapidations / Reinstatement

Project-Specific

Strip-out or reinstatement works carried out to an agreed schedule or scope. TCM does not determine the legal dilapidations obligation; the relevant landlord/tenant advisers define it.

Energy-Improvement Works

Energy Scope

Building-fabric and services upgrades can form part of a commercial refurbishment where required by the project brief or current energy-performance obligations. The technical scope and assessor responsibilities are project-specific.

How We Deliver Your Refurbishment

01

Existing-Condition Review

Review the premises, available drawings, existing services information, access constraints and any known hazardous-material or structural information relevant to the proposed work.

02

Specification & Programme

Define the refurbishment scope, retained elements, specialist interfaces, phasing requirements and programme assumptions. Occupied-premises controls are project-specific.

03

Quotation

Quotation detail should reflect the agreed specification and identify relevant inclusions, exclusions, allowances, assumptions, VAT basis and unresolved items where applicable.

04

Construction

TCM can undertake building work directly and coordinate specialist contractors or professional disciplines where the agreed scope requires them. Working arrangements and progress reporting are agreed for the individual project.

05

Snagging & Handover

Snagging and handover follow the agreed scope. O&M information, warranties, as-built records and statutory documents are provided by the responsible parties where applicable.

Commercial Refurbishment Costs

Refurbishment TypeCost RangeNotes
Light RefurbishmentProject-specificDecoration, finishes and selected upgrades according to the agreed specification
Medium RefurbishmentProject-specificMay include reconfiguration, services and wider refurbishment work
Heavy RefurbishmentProject-specificMay include structural, building-services and fabric work
Energy-Improvement WorksProject-specificScope depends on the building, assessment and selected measures
Dilapidations / ReinstatementProject-specificBased on the agreed schedule or reinstatement scope
Cat A ReinstatementProject-specificConfirm the actual Cat A definition and landlord requirements for the premises

Costs are indicative for Hertfordshire and North London. All projects are priced individually based on condition survey and specification.

Commercial refurbishment upgrades or repairs existing premises rather than starting from an empty shell. The scope can range from decoration and finishes to reconfiguration, building-services replacement, structural work and external-fabric repairs. Existing condition matters: concealed services, hazardous materials, structural constraints, landlord requirements and occupation can all affect the project. TCM can undertake the agreed building work and coordinate specialist contractors or professional disciplines where required by the scope.

Energy performance can be one reason to refurbish commercial premises, but it is not the only driver and there is no universal TCM EPC-improvement package. Current letting requirements, exemptions, assessor recommendations and future policy should be checked against the actual property and current official guidance before work is specified.

What You Need to Know

Asbestos Information Before Refurbishment

Where refurbishment may disturb materials that could contain asbestos, suitable asbestos information and, where required, the appropriate survey should be in place before disturbing work begins. The competent survey/removal route depends on the work; TCM does not claim an in-house asbestos-survey or removal role.

Building Regulations

Building Regulations requirements depend on the proposed work. Structural, fire-safety, accessibility and building-services changes may require approval or competent-person certification; the applicable route and responsible designers should be confirmed for the individual project.

CDM Regulations 2015

CDM duties apply according to the project circumstances. Principal Designer and Principal Contractor appointments depend on the number of contractors and project arrangements, while HSE notification is a separate threshold. TCM only takes a CDM dutyholder role where actually appointed.

Occupied Refurbishment

Refurbishment can sometimes be phased around continued occupation, but access, segregation, dust/noise controls, working hours, temporary services and programme consequences are project-specific and should be agreed before work begins.

Fire Safety

Refurbishment can affect fire-safety provisions. The required design, approvals, fire-risk information and specialist input depend on the building and proposed work; TCM coordinates its construction scope with the responsible parties where agreed.

Dilapidations / Reinstatement Scope

Lease-end reinstatement obligations are determined by the lease and relevant professional/legal advice. TCM can price and carry out an agreed reinstatement scope but does not determine the parties’ legal obligations.

Everything Else You Should Know

EPC Improvement and MEES Compliance

Energy-performance improvement should follow the actual EPC/assessment, building condition, services, intended use and current legal position. No fixed EPC-point gain, future EPC target or TCM-wide measure ranking is asserted here.

Planned Preventive Maintenance vs Refurbishment

The choice between continuing maintenance and carrying out a wider refurbishment depends on condition, operational needs, service life, disruption, compliance requirements and investment objectives. TCM can discuss construction scope; whole-life cost or investment advice should be appropriately sourced.

Refurbishment for Re-Letting

A refurbishment can improve condition and presentation before re-letting, but rental-value outcomes are market-specific. TCM does not guarantee a £/sq-ft rental uplift or financial return.

Heritage and Listed Buildings

Listed or conservation-area premises can require additional consent and specialist design input. The applicable planning or listed-building route should be confirmed for the actual property; this page does not claim an unverified TCM heritage-project track record.

Commercial Refurbishment FAQs

Ready to Refurbish Your Commercial Property?

Contact TCM to discuss your project. Scope, access, specialist responsibilities and approval requirements remain project-specific.