Skip to main content
Borehamwood, Hertfordshire 07305 121634
TCM Building & Maintenance

Foundations &
Groundworks

Groundworks can include excavation, foundations, drainage and concreting. Coverage, site conditions, structural or drainage design and specialist responsibilities are confirmed for the individual project.

Groundworks Services

Excavation & Earthworks

Site preparation and excavation to the agreed project scope, with access, temporary works, spoil handling and service risks considered for the actual site.

Foundations

Foundation construction to the project-specific structural design or specification where required. Foundation type and dimensions are not assumed from a generic house type.

Drainage & Utilities

Foul and surface-water drainage and related service interfaces where included, with existing routes, levels, approvals and specialist responsibilities confirmed for the project.

Concreting

Concrete slabs and other concrete work to the agreed design, preparation and reinforcement requirements for the intended use.

Retaining Walls

Retaining-wall construction where the structural and drainage design, boundary interfaces and access requirements are defined for the project.

Underpinning

Underpinning or foundation-strengthening work only to an appropriate structural design and method for the actual property. This is not a DIY procedure.

Site-Specific Scope
Ground and access considered
Design Responsibility
Confirmed per project
Ground Uncertainty
Allowances stated
Completion Evidence
Project route confirmed

Compare Groundworks Project Information

When comparing groundworks examples, check the ground conditions, design, access, drainage and temporary-works requirements. A foundation choice or programme from another site does not establish what is suitable for yours.

Read published customer reviews

Groundworks FAQs

Need Groundworks?

Contact TCM to discuss your project. Assessment requirements, design responsibility, specialist input, allowances and quotation terms are confirmed for the individual project.

Groundworks are the below-ground and site-preparation activities that support a construction project. Depending on the job, this can include excavation, drainage, foundations, slabs, retaining structures and service interfaces. The work should follow the actual site information and the responsible structural, drainage or other specialist design where required. Ground uncertainty, access and concealed services should be reflected in the assessment and quotation rather than treated as fixed assumptions.

Before groundworks begin, establish the intended structure, available survey information, access, drainage route, known services and any structural or specialist design required. Do not excavate, alter foundations or disturb underground services from generic website instructions.

What You Need to Know

Foundations and Structural Scope

Foundation type, dimensions and reinforcement should come from the project design and site conditions where structural design is required. This page does not prescribe one foundation type or depth for every property.

Drainage and Water Management

Drainage scope should identify foul and surface-water routes, levels, connections, existing systems and any required approvals or specialist design. Concealed conditions can affect the final work.

Excavation and Site Preparation

Excavation should be planned around access, ground conditions, neighbouring structures, temporary works, spoil handling and known or suspected underground services. Safety-critical excavation and structural work requires the appropriate competent route.

Concrete, Slabs and Retaining Structures

Concrete slabs and retaining structures are project-specific. The design, ground preparation, drainage, reinforcement and interfaces should be defined for the intended use rather than inferred from a generic service description.

Everything Else You Should Know

Understanding Groundworks Costs

Groundworks cost depends on excavation, ground conditions, access, drainage, temporary works, structural design, disposal, concrete, specialist work, VAT and exclusions. Compare quotations on the same stated scope and allowances rather than relying on a generic rate.

Planning, Building Control and Design Responsibility

Planning permission and Building Regulations are separate from the construction scope. The project documents should state who is responsible for structural, drainage or other design, submissions, inspections and completion records where they apply.

Professional and Safety Boundary

Excavation, underpinning, retaining structures, structural foundation changes and work near underground services can create serious risks. This page does not provide DIY instructions. Use the appropriate structural, utility, building-control or competent contractor route for the work.

Allowances for Ground Uncertainty

Ground conditions and concealed services may not be fully known before work starts. A useful quotation states the information relied on, provisional or excluded items, and how additional work is assessed and authorised if site conditions differ.